this post was submitted on 19 Nov 2024
330 points (98.8% liked)

Technology

59495 readers
3081 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] tfowinder@lemmy.ml 16 points 2 days ago (22 children)

What are features of Salesforce that is not possible to keep in spreadsheet?

I know spreadsheet don't scale but genuinely curious dif there is something that is not possible with excel.

[–] 9488fcea02a9@sh.itjust.works 5 points 2 days ago (3 children)

everything is possible in excel... someone wrote a DOOM clone in excel.

I once worked at a company where someone hacked together a PO generating tool in excel 10 years prior and it just kind of stuck around even though the company grew into a billion dollar market cap public company

[–] Cracks_InTheWalls@sh.itjust.works 2 points 1 day ago* (last edited 1 day ago)

Excel is a dev environment for us folks who aren't 100% sure what a dev environment actually is.

I've at least evolved to the point that I know better options exist, and higher ups should talk to the people who know what those options are and how they can leveraged. Those people are busy, though, so the cycle continues...

[–] DacoTaco@lemmy.world 3 points 1 day ago (1 children)

I made a poc for a company that wanted to replace the way they programmed their pick and place robots that were powered by... Excel.
( the excel made an connection to the plc and wrote the data. It took 30+ minutes, while the poc took less than 3s xD )

[–] Randelung@lemmy.world 2 points 1 day ago (1 children)

That must have been terribly satisfying.

I'm sure the workbook still exists somewhere, though, 'just in case'. And someone argued that the new way is much less accessible than the workbook.

[–] DacoTaco@lemmy.world 2 points 1 day ago* (last edited 1 day ago)

Sadly, it was just a proof of concept, writing random bits the size of the actual data to the plc. We swore it would result with the project being assigned to our company, but the other company's project manager quit soon after and we lost all contact with the company.. :(

[–] Noerttipertti@sopuli.xyz 2 points 1 day ago

Wrote excels that controlled building automation and heat exchanger settings, collected water and electricity meter data automatically and created bills ready to print and mail to tenants.
That was about quarter century ago.

load more comments (18 replies)