this post was submitted on 10 Aug 2024
133 points (96.5% liked)

Technology

59605 readers
3403 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[โ€“] conciselyverbose@sh.itjust.works 71 points 3 months ago (8 children)

During the course of our testing, we observed that Windows 11 was scheduling workloads on the 9700X in a manner that would try to saturate a single core first, by placing workloads on each of its logical threads.

๐Ÿคฆโ€โ™€๏ธ

[โ€“] adarza@lemmy.ca 31 points 3 months ago (6 children)

so, basically, the os isn't tuned for the new chips yet.

the 2nd threads on smt-enabled cores are supposed to get hit last.

[โ€“] barsoap@lemm.ee 3 points 3 months ago* (last edited 3 months ago)

For values of "new chips" that include 20 year old ones. Foster was released 2001, the chips were single-core but you could have up to eight on a board so it's still multi-core SMT. First on-die multi-core SMT seemed to have been Paxville, 2005.

Or maybe Windows server has a proper scheduler and they never bothered bringing it to desktops?

load more comments (5 replies)
load more comments (6 replies)