417
this post was submitted on 10 Aug 2024
417 points (97.5% liked)
Technology
59982 readers
2427 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related content.
- Be excellent to each another!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, to ask if your bot can be added please contact us.
- Check for duplicates before posting, duplicates may be removed
Approved Bots
founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
Using commercial off the shelf technology without proper testing and certification is absolutely cutting corners. See: Kaprun disaster.
What kind of fire rating did those COTS parts throughout the interior of the vessel have? What kind of redundancy existed? Would you use a Logitech controller for a spacecraft? The requirements of deep sea submersibles and spacecraft are quite similar. Would any of the submersible certification agencies approved this? I think not.
I see the Logitech controller, the carbon fiber hull, and so many other decisions he made as symptoms of the same corner cutting, “move fast and break things” mentality he had.
I just read the wikipedia article; thanks for mentioning it.
I'm not sure it's a good example of your point, though. Notably:
The fan heater is the only off-the-shelf technology listed here, and there's no suggestion that it was part of the train's design. It seems likely that a train conductor brought it on board to keep the compartment warm through the workday. Still a bad idea in a train, especially on a 30° slope, but not an example of the designers cutting corners.
Edit:
Thanks to others for linking photos and a report (in German) that show how the heater was installed. It was clearly not a case of a conductor just setting the heater on the floor, but the installation still looks very much out of place. Perhaps corner-cutting was involved, but this doesn't look like something done by the train designers. Even an expensive industrial heater seems like it would be an extraordinarily bad idea in that location, right up against high-pressure hydraulic oil lines. Does someone have the details behind it? It looks more likely a (very foolish) modification made by someone else, like maybe the train operators.
For anyone else following this, those hydraulic oil lines that the heater was nearly touching were apparently pressurized at 190 bar, which I think is about 2700 pounds per square inch.
It’s an example of uncertified consumer grade equipment used in a commercial environment to disastrous results, outside of its original designed purpose. It’s one of the most well known examples of why you don’t use consumer grade hardware in a commercial/industrial setting.
It was not brought on board by the conductor or someone else, it was permanently installed in the train in place of commercial grade heaters they couldn’t source. It was installed in the wall during assembly.
I’d argue it is an example of cutting corners, they didn’t want to find / pay more for commercial grade heaters. It was not compliant with the original design nor fire safety standards.
Wow. That's creepy in a fascinating way. Cutting corners costs lives, and this is a perfect example.