this post was submitted on 12 Jul 2024
968 points (95.6% liked)

Technology

59589 readers
2936 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
(page 3) 50 comments
sorted by: hot top controversial new old
[–] Phoenix3875@lemmy.world 7 points 4 months ago (1 children)

They tried to build this abomination in London and it got shot down.

load more comments (1 replies)
[–] SunDevil@lemmy.ml 7 points 4 months ago (2 children)

"Capable of drawing 28,000,000 watts of power" doesn't tell us anything. As was noted, it should've been given in megawatts (28 mW) or kilowatts (28,000 kW). Clickbait aside, how many kilowatt-hours (kWh) does it actually use?

28 mW isn't that much energy, relatively speaking. As of 2015, Forbes estimated LV uses 8000 mW on an average summer day.

The potential is impressive. I doubt it pulls anywhere near that. Unless I did my math wrong, this seems sensationalist.

[–] Zeoic@lemmy.world 4 points 4 months ago (1 children)

Just Fyi, mW is milliwatts, and MW is megawatts. Agreed though, I doubt it draws that much day to day.

load more comments (1 replies)
load more comments (1 replies)
[–] gianni@lemmy.ml 6 points 4 months ago (7 children)

We need more nuclear power ASAP

[–] frezik@midwest.social 6 points 4 months ago* (last edited 4 months ago) (1 children)

There's no such thing as "ASAP" for nuclear power. If you had the permits signed off today, it would take 10 years before a single GWh of new nuclear energy goes to the grid.

Instead, maybe we shouldn't build giant spherical advertising displays?

[–] GamingChairModel@lemmy.world 6 points 4 months ago

There's no such thing as "ASAP" for nuclear power

Sure there is. It's just that the P stands for "20 years from now."

load more comments (6 replies)
[–] xthexder@l.sw0.com 6 points 4 months ago (1 children)

So how is the total power over 500x that of the GPU power? If it's all LEDs, that thing must get brighter than the damn sun.

[–] Jackfinished@lemmy.world 3 points 4 months ago

Funny enough you can barely see it during the day

[–] Arbiter@lemmy.world 4 points 4 months ago

Look upon my works ye mighty and despair.

[–] PhlubbaDubba@lemm.ee 4 points 4 months ago

Normally I'd be suspicious of these kinds of megastructure projects but Vegas is the city that figured out how to get damn close to net zero water use from the Colorado so I'm willing to start off with the benefit of the doubt for the city leaders that ok'd this.

load more comments
view more: ‹ prev next ›