this post was submitted on 10 Feb 2024
46 points (100.0% liked)

Linux

48287 readers
590 users here now

From Wikipedia, the free encyclopedia

Linux is a family of open source Unix-like operating systems based on the Linux kernel, an operating system kernel first released on September 17, 1991 by Linus Torvalds. Linux is typically packaged in a Linux distribution (or distro for short).

Distributions include the Linux kernel and supporting system software and libraries, many of which are provided by the GNU Project. Many Linux distributions use the word "Linux" in their name, but the Free Software Foundation uses the name GNU/Linux to emphasize the importance of GNU software, causing some controversy.

Rules

Related Communities

Community icon by Alpár-Etele Méder, licensed under CC BY 3.0

founded 5 years ago
MODERATORS
top 5 comments
sorted by: hot top controversial new old
[–] Granixo@feddit.cl 7 points 9 months ago (1 children)

We already on Linux 6.9?

I swear i feel like Linux 4 released last year.

[–] pastermil@sh.itjust.works 6 points 9 months ago

Almost.

Current stable is 6.7, the RC is on 6.8.

[–] autotldr@lemmings.world 1 points 9 months ago

This is the best summary I could come up with:


Along with the recently merged Intel OpenGL and Vulkan driver support for Arrow Lake next-generation Core processors with Mesa 24.1, it looks like the i915 kernel graphics driver support for Arrow Lake will be all-set with the upcoming Linux 6.9 kernel cycle.

Sent out this week was the newest drm-intel-next pull beginning to queue more feature code that will go into the Linux 6.9 merge window.

Most notable there is adding new graphics PCI IDs to be found with the Intel Arrow Lake processors.

So with just needing the new PCI IDs and not gating them behind the "force_probe" option or any other extra steps over Meteor Lake, with Linux 6.9 + Mesa 24.1 it looks like the integrated graphics of Arrow Lake will be good to go.

Linux 6.9 stable should be out around the middle of the year while Arrow Lake processors are expected in H2'2024.

There's already been much Arrow Lake driver enablement work in other areas of the kernel -- not to mention Intel Linux engineers already being very busy with enabling its successor, Lunar Lake with its exciting Xe2 graphics.


The original article contains 259 words, the summary contains 185 words. Saved 29%. I'm a bot and I'm open source!

[–] cmgvd3lw@discuss.tchncs.de 1 points 9 months ago (1 children)