this post was submitted on 09 Feb 2024
500 points (95.8% liked)
Technology
59534 readers
3223 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related content.
- Be excellent to each another!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, to ask if your bot can be added please contact us.
- Check for duplicates before posting, duplicates may be removed
Approved Bots
founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
It's easier said than done, but it's not that difficult. It's mostly reconfiguration of plumbing and zone controls on HVAC. The electrical is easier to distribute.
If you commit to doing it the right way, and tear it down to the structure (but leave the facade alone), it's not terribly difficult.
The problem is that the building owners want to do it cheap, and it won't be cheap. It will be more economical in the long run than fully vacant building though.