this post was submitted on 26 Apr 2026
65 points (93.3% liked)

Technology

84103 readers
2536 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related news or articles.
  3. Be excellent to each other!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
  9. Check for duplicates before posting, duplicates may be removed
  10. Accounts 7 days and younger will have their posts automatically removed.

Approved Bots


founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] IsoKiero@sopuli.xyz 10 points 11 hours ago (1 children)

Not surprising at all. Every worker everywhere does this if they have some sort of 'tokens' they need to consume. Helpdesk ticket count is one pretty common with IT-folks and it's easy enough to boost if you just write one from every single small thing you've done for the day.

None of these obviously are beneficial for the actual work getting done, but as the game is 'make KPI numbers look good' then that's exactly what gets done.

[–] wizardbeard@lemmy.dbzer0.com 5 points 7 hours ago

Exactly. I'm not helpdesk anymore, thank god, but my team still has a ton of day to day work that's tracked in the ticketing system.

Well, for years I've been stuck in project hell, doing work that isn't easily fit into the ticket system. My last review my boss said I had only closed about 1/3 of the tickets of the next lowest person on my team, and that it doesn't matter except we have a new exec watching that shit, so I have to make it look better.

So the next project I got, I chose to do something manually that I could have automated, that required the help desk to open tickets direct to me about 2-4 times a day whenever someone new needed access to the system I was setting up, until the project was done.

A week in I automated the "manual" task anyway and had a bunch of tickets I could close with a copy-pasted resolution.

I would feel bad, but my co-workers game the metrics even worse than I do.