this post was submitted on 01 Jun 2024
394 points (97.6% liked)
Technology
59534 readers
3199 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related content.
- Be excellent to each another!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, to ask if your bot can be added please contact us.
- Check for duplicates before posting, duplicates may be removed
Approved Bots
founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
Yes, NuScale wasn't scrapped due to lawsuits, I was more referring to the delays to Blue Castle, which was delayed for 3-ish years due to lawsuits.
NuScale is a pretty small operation promising something like 300-400MW. Blue Castle is a lot larger promising ~1500MW.
Initially, yes, but amortized over the life of the plant, it's pretty cheap. It has a high upfront cost and relatively low operating costs. And one of the big operating costs (waste disposal) won't be an issue here, the larger issue is water access for cooling, and that's political (farmers don't want to give up water rights).
My main concern is seismic activity, since if we get an earthquake, it'll likely be very violent. That increases initial costs, but doesn't really impact ongoing costs. Utah just doesn't like throwing large sums of money around, hence the political pushback.
We're still >50% fossil fuels, so I'll support anything that replaces that. I like hydrogen (in development), geothermal (in development), solar (expanding), and wind (seems to be slowing), but that's not going to be enough. Even if all of those were operating today, we'd still be using significant amounts of fossil fuels. I think we will still need nuclear, we have the space and demand for it.