this post was submitted on 08 Oct 2024
340 points (99.7% liked)

Memes

52914 readers
992 users here now

Rules:

  1. Be civil and nice.
  2. Try not to excessively repost, as a rule of thumb, wait at least 2 months to do it if you have to.

founded 6 years ago
MODERATORS
 
all 23 comments
sorted by: hot top controversial new old
[–] cyborganism@lemmy.ca 42 points 1 year ago (1 children)

Step 4 is when you become the senior engineer, show up to work in sweatpants and a dirty t-shirt with Crocs, and don't go to meetings anymore unless it's about major architectural decisions, and they can't fire you because you've become an oracle of the company software.

[–] Annoyed_Crabby@monyet.cc 31 points 1 year ago (1 children)

4)become important enough people will wait for you in the meeting room when you're 2 hours late.

[–] Flocklesscrow@lemm.ee 7 points 1 year ago

2 hours later

"Can someone just send me the meeting notes? Thanks."

[–] Frog@lemmy.ca 31 points 1 year ago

I'm in between stages where I feel offended to not be included in meetings but when I am included, I hate it.

[–] DmMacniel@feddit.org 30 points 1 year ago (1 children)

Stage four is picking up farming.

[–] ArmoredThirteen@lemmy.ml 11 points 1 year ago

I'm picking up woodworking x.x

[–] Skyline969@lemmy.ca 23 points 1 year ago (1 children)

Stage 4 is picking and choosing which meetings are worth your time to attend.

[–] Samsy@lemmy.ml 16 points 1 year ago

Stage 5 is you create the meetings.

[–] Rolder@reddthat.com 19 points 1 year ago (1 children)

I think there’s a stage where you are in meetings that you have nothing to contribute in and get to just sit there and have a free break for a bit

[–] leisesprecher@feddit.org 13 points 1 year ago

WFH + useless meetings = all my chores are done.

[–] Mouselemming@sh.itjust.works 13 points 1 year ago

Which is the stage of, "I'm bored because the people I'm supposed to supervise are busy doing all the stuff. I think I'll call a meeting."

(Too many people are at this stage)

[–] lolola@lemmy.blahaj.zone 11 points 1 year ago (1 children)

I'd say stage 4 is being the keystone attendee: if you don't go, the whole thing falls apart. Even if you somehow manage to get out of the meeting, it has to get rescheduled because it "needs" your input. The meeting thus becomes inescapable.

Stage 5 is when everyone else realizes you're in stage 4 and begins to cater to your availability and preferences. Obviously this is mostly theoretical.

[–] ouRKaoS@lemmy.today 4 points 1 year ago

Stage 6 is when you're too important for meetings, and if you show up to one everyone is terrified.

Stage 4 is inoperable and fatal.

[–] Godort@lemm.ee 9 points 1 year ago (1 children)

This makes perfect sense to me.

At the start of your career, you want to be important enough that people will care about your opinions, which means getting invited to meetings where things are discussed.

Stage 2, you've been there long enough and know how things work so you can offer input and help make decisions.

Stage 3 is the point at which people will come to you for input outside of meetings because that's easier. You just want to do your job and generally don't care about decisions anymore unless they bring sweeping changes.

[–] Dirk@lemmy.ml 5 points 1 year ago

At all stages I want to be left alone and just do what I'm paid for.

Enlightenment: calling meetings yourself because nothing you do matters and getting paid to listen to assholes talk isn't the worst way to pay rent.

[–] Venator@lemmy.nz 8 points 1 year ago (1 children)

I think I skipped stages 1 and 2 😅

[–] draconik@infosec.pub 3 points 1 year ago
[–] JimmyBigSausage@lemm.ee 2 points 1 year ago

Stage 4 is what is a meeting?

[–] h3mlocke@lemm.ee 1 points 1 year ago