this post was submitted on 27 Sep 2024
688 points (99.0% liked)

Technology

59534 readers
3197 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] Kecessa@sh.itjust.works 20 points 1 month ago (2 children)

Sure, because they don't have any budget themselves...

[–] CmdrShepard42@lemm.ee 5 points 1 month ago (2 children)

They have a $25B yearly budget.

What is SpaceX spending on R&D? From what I've read, Starship is estimated to cost $10B for development and their R&D budget for 2023 was $1.5B. If NASA was going to build something similar themselves, they've had nearly 70 years and hundreds of billions to accomplish it.

In reality their budget goes toward companies like Boeing, Northrop Grummon, and Lockheed Martin, who then pocket it and build substandard equipment. This is all public information so I can't imagine why people are downvoting other than being extremely emotional for some inexplicable reason.

[–] theneverfox@pawb.social 12 points 1 month ago (1 children)

NASA doesn't have effective control of their budget anymore. Congress holds the purse strings and uses them like a harness

NASA gets funding to do something - like go to the moon, or track CO2 emissions. But it comes with strings - sometimes you have to build a certain component in a certain congressional district, sometimes Congress chooses the design you have to use

It's a problem of politics and corruption. When the public supports NASA, they have more autonomy. When NASA gets a blank check, they do more with it - reusable rockets aren't a new idea, and when they cancelled the shuttle program NASA had brain drain. Some of those people founded spaceX - Elon didn't start it, he came in when they were getting off the ground, just like with Tesla

[–] intensely_human@lemm.ee 0 points 1 month ago

From wikipedia:

In early 2002, Elon Musk started to look for staff for his company, soon to be named SpaceX. Musk approached five people for the initial positions at the fledgling company, including Michael Griffin, who declined the position of Chief Engineer,[17] Jim Cantrell and John Garvey (Cantrell and Garvey would later found the company Vector Launch), rocket engineer Tom Mueller, and Chris Thompson.

So your claim that

Some of those people founded spaceX - Elon didn't start it, he came in when they were getting off the ground, just like with Tesla

conflicts with wikipedia’s history of the company.

[–] slumberlust@lemmy.world 2 points 1 month ago* (last edited 1 month ago) (1 children)

You are omitting the lede. Public appetite for failure on tax payer funds is near zero. That increases time, complexity, and cost for launches (with or without humans aboard).

[–] CmdrShepard42@lemm.ee 0 points 1 month ago (1 children)

Which can be a failure in itself when you spend 10 years and tens of billions building something "perfectly" only for it to break on its maiden voyage. That makes you wonder what was the point of doing everything so methodically when they could have taken a more efficient and iterative approach.

[–] slumberlust@lemmy.world 1 points 1 month ago

I'm not saying it's a good system, but one that exists due to the nature of the funding. Those external pressures (especially when it gets political) just don't allow for the same amount of mistakes.

Remember, SpaceX was one failed launch away from bankruptcy.

[–] ripcord@lemmy.world 0 points 1 month ago

What spacecraft do you think they built themselves, without big contractors doing mos5 of the work...?